| Location of Project: |
|
| Description of lagoon or project: |
|
| Dimensions of Lagoon: |
Length:
ft/m |
| |
Width:
ft/m |
| |
Depth:
ft/m |
| Describe lagoon's sides, bottom and conditions (i.e. is it lined, tree branches and stumps, swamp grass, rocks present, tree roots, cattails, trash, etc
): |
|
| |
|
| How high are the dikes above the lagoon floor?: |
ft/m |
| |
|
| Materials to be dredged on this project are the following: |
|
| |
|
| Loose and free flowing materials include: |
|
| |
|
| Hard and compacted materials include: |
|
| |
| Toxic:
PH:
Abrasiveness:
|
| Specific Gravity:
Viscosity:
% Solids:
|
| |
|
| Is water standing on top of lagoon? |
Yes
No |
| If yes, how much? |
ft/m |
| Is make up water available? |
Yes
No |
| Sludge or solids settled on lagoon floor? |
ft/m |
| Maximum Discharge distance: |
ft/m |
| Floating pipeline: |
ft/m |
| Max Terminal Elevation: |
ft/m |
| Req'd pump flow performance: |
L/GPM |
| Maximum digging depth: |
ft/m |
| Range of Tide: |
ft/m |
| Total Est. Cubic Yards to be dredged: |
yards |
| Time frame to complete: |
days |
| Main Power Source: |
|
| Diesel Engine Installed aboard the Dredge? |
Yes
No |
| Electric current from shore: |
Yes
No |
| |
| Volts:
Phase:
Cycles:
|
| |
|
| Line distance from power source to Lagoon Pumper? |
ft/m |
| Will generator be required? |
Yes
No |
| Remote controls?: |
Yes
No |
| If yes, what length of remote cable needed: |
ft/m |
| Anchor and winch line harness set required? |
Yes
No |
| Added information on this project: |
|
| |
|
By completing this form, you are giving us permission to add you to our mailing list. |