|
Project
Information
|
|
Location of
Project:
|
| Description
of lagoon or project: |
|
|
|
Dimensions
of Lagoon:
Length:
ft/m Width:
ft/m Depth:
ft/m
|
| |
| Describe
lagoon's sides, bottom and conditions (i.e. is it lined, tree
branches and stumps, swamp grass, rocks present, tree roots,
cattails, trash, etc
): |
|
| How
high are the dikes above the lagoon floor?: |
ft/m |
Materials
to be dredged on this project are the following:
|
|
Loose
and free flowing materials include:
|
|
Hard
and compacted materials include:
|
|
Toxic:
PH:
Abrasiveness:
|
Specific Gravity:
Viscosity:
% Solids:
|
Is water standing
on top of lagoon?
|
Yes
No
|
| If yes, how much?
|
ft/m |
| Is make up water
available? |
Yes
No |
| Sludge or solids
settled on lagoon floor? |
ft/m |
| Maximum Discharge
distance: |
ft/m |
| Floating pipeline:
|
ft/m |
| Max Terminal Elevation:
|
ft/m |
| Req'd pump flow
performance: |
L/GPM |
| Maximum digging
depth: |
ft/m
|
| Range of Tide:
|
ft/m |
| Total Est. Cubic
Yards to be dredged: |
yards |
| Time frame to
complete: |
days |
| Main Power Source:
|
|
| Diesel Engine
Installed aboard the Dredge? |
Yes
No |
| Electric current
from shore: |
Yes
No |
| Volts:
Phase:
Cycles:
|
| Line distance
from power source to Lagoon Pumper? |
ft/m |
| Will generator
be required? |
Yes
No |
|
|
Yes
No |
|
If yes, what
length of remote cable needed:
|
ft/m |
Anchor and winch
line harness set required?
|
Yes
No |
Added information
on this project:
|
|
|
|